Cement silo composition
Cement silo composition
Composition of cement silo: steel structure of silo, climbing ladder, guardrail, feeding pipe, dust collector, pressure safety valve, high and low level meter, discharge valve, etc.
Structure: The cement tank is a cylindrical structure, the bottom is supported by four round pipe legs, the whole silo is in the form of steel structure, welded together; the top is equipped with dust collector and pressure safety valve.
Production instructions.
1. The storage silo made by our company conforms to the industry standard.
2. Discharge height is 1.96m, 4.2m, also can be processed and made according to user requirements.
3. The capacity of cement tank is 60t, 100t, 200t, etc.
Working principle
1. When the cement tank is working, it must be lifted by a special crane and then put on the prefabricated concrete foundation, and check the verticality of the cement tank with the horizontal surface after it is lifted, and then weld the bottom with the foundation pre-built parts firmly.
2. After the storage bin is fixed, the cement is transported to the site by the bulk cement truck, and then the conveying pipeline of the bulk cement truck is connected to the feeding pipeline of the cement tank, and the cement in the tank is transported to the cement tank through the gas pressure of the bulk cement truck.
3. In the process of conveying cement to the storage silo, the operator has to press the button of the dust collector vibration motor uninterruptedly to shake off the cement attached to the dust collector bags to prevent blocking of the bags and bursting of the silo.
4. Once the bag is blocked, the pressure in the bin exceeds the safety pressure of the pressure safety valve at the top of the bin, the pressure safety valve can be opened to release the pressure in the bin to prevent the explosion of the bin.
5. The high and low material level can observe the bin full and lack of material.
6. When the material needs to be released, first open the manual discharge valve at the bottom of the cone, and then transport the cement out through the cement conveying device. In the process of material release, if the phenomenon of "arching" occurs, press the button of the solenoid valve of the arch-breaking device in time to blow air to eliminate "arching" and feed the material to ensure smooth cement supply.
7. When the cement conveying device fails, first close the manual discharge valve at the bottom of the cone to prevent the cement from overflowing and causing waste.