Model: HLS120 Concrete Mixing Station Type: Inclined belt
Productivity: 120 cbm/hour Weight: 60,000kg
Matched Mixer: JS2000 Power of the Mixer: 2*37KW
Input Capacity: 3000L Output Capacity:2000L
Batching Machinery: 4*20cbm Belt Transport Ability: 700T/H
Discharge Height: 4.2m Total Power: 145KW
Hls120 Concrete Batching Plant
1.Modular design, convenient to gather and disassemble;
2.Adopting excessive-efficiency mixer,high manufacturing performance, suitable for various concrete blending wishes
3.The mixture measurement machine achieves excessive-precision measurement of mixture by optimizing the discharge door structure, enhancing the vibration form of the vibrator, and growing the closing velocity of the release door.
4. There may be a liquid garage bag on the top of the water/additive weighing scale so that it realizes the coarse-exceptional dimension.
5. With siemens business control laptop as the platform, the manufacturing manipulate software adopts the maximum advanced computerized scale repayment and deduction scale technology in china to make certain that the dimension accuracy of numerous raw materials meets the technical necessities of excessive-velocity railway construction;
Model | HLS60 | HLS90 | HLS120 | HLS180 | HLS240 | ||
Rated Productivity(m³/h) | 60 | 90 | 120 | 180 | 240 | ||
Mixer | Mode | JS1000 | JS1500 | JS2000 | JS3000 | JS4000 | |
Driving Power (KW) | 2*18.5 | 2*30 | 2*37 | 2*55 | 2*65 | ||
Discharge Capacity (L) | 1000 | 1500 | 2000 | 3000 | 4000 | ||
Max Aggregate Size (MM) | ≤60/80 | ≤60/80 | ≤60/80 | ≤60/80 | ≤60/80 | ||
Batching Machinery Size (m³) | 15 | 15 | 20 | 25 | 40(underground) | ||
Measuring Accuracy | Aggregate | 2% | 2% | 2% | 2% | 2% | |
Cement | 1% | 1% | 1% | 1% | 1% | ||
Water | 1% | 1% | 1% | 1% | 1% | ||
Additive | 1% | 1% | 1% | 1% | 1% | ||
Maximum Weighing (kg) | Cement | 800 | 1000 | 1000 | 1800 | 2400 | |
Water | 400 | 400 | 500 | 800 | 1000 | ||
Additive | 25 | 25 | 40 | 70 | 100 | ||
Discharge Height (M) | 4.2 | 4.2 | 4.2 | 4.2 | 4.2 | ||
Total Power(kw) | 90 | 125 | 160 | 200 | 270 |
Detailed Information:
First: The main station dust collecting
1. Adopt pulse dust collector to actively collect the dust generated by the equipment
2. Dust collector is placed on the top of the middle storage bin, dust removal efficiency reaches 99.9%.
3. Automatic pulse cleaning of the dust collected by the filter bag to avoid secondary dust pollution
4. Open structure, easy to repair and maintain
Second. Low noise
1. Mixer legs are equipped with shock absorbing pads to reduce the vibration generated by the operation of the mixer and reduce the noise of the equipment
2. The sound insulation effect of high quality rock wool board is more than 50% higher than the traditional one.
3. The use of screw air compressor, low noise, large air volume, low failure rate
4. Ground bin batching machine, significantly reduce the noise generated by aggregate measurement
Third. Famous brand accessories
Fourth:
The main machine is equipped with a camera to monitor the internal situation of the main machine in real time; it can be equipped with a high-pressure cleaning device to reduce the difficulties of workers cleaning the mixer and the downtime caused by holding the shaft.
FAQ
1. What’s the difference of the HZS and HLS Concrete Mixing Station?
HZS series means the aggregate lifting type is the skip hoist and the HLS series is the inclined belt.
2. How we choose the size of the concrete mixing station?
Usually we suggest customer choose the size and type according to the coverage area and the productivity of per hour. For example, customer has big space with 200 cubic meters concrete each day, then we can suggest the HLS240 concrete mixing station.
3. What’s the advantages of the bolted cement silo?
bolted cement silo is not only designed for foreign customer but also for our domestic market.
For foreign customer it can save delivery space which will reduce the freight charges and for domestic market it can protect the environment because it avoid the outdoor welding.
4. What customer should provide before we design?
Commonly, we need the know how many kinds of the aggregate, the powder, additive type. This is the most important. What’s more the language and voltage is necessary.
5. The installation
About the installation we will arrange engineer to guide and train the operate workers, so no worry about this.
6. Payment terms and production cycle
30% prepayment when place the order, the balance should pay before delivery. Usually the delivery time is 20 days after the prepayment.
Submitted successfully
We will contact you as soon as possible