Foundation of the Concrete Mixing Plant

2022/05/16 10:33

What do you need to pay attention to when digging the foundation of the concrete mixing plant?


  The construction of a concrete mixing plant starts with planning the site, running the formalities, and when ordering equipment from colleagues, you have to start paying attention to the foundation planning.


  Generally in which the company ordered the equipment, the company will send someone to assist in planning the foundation, commonly known as spreading or delineation.


  After determining the type of mixing plant purchased by the customer, the mixing plant manufacturer will design a reasonable mixing plant according to the site or other requirements and determine its type, direction and other parameters, and then draw a CAD foundation plan based on these data, and then the manufacturer's business or technical staff will assist the customer in the planning of the site, scattering lines according to the plan, and after scattering, you can dig and build according to the line.


  The foundation of the mixing plant generally has several big rules. Small mixing plants have 1.5m legs, and 3.8m discharge, while large mixing plants generally have 3.8m or 4.2m discharge; small mixing plants generally use above-ground batching machines, while large mixing plants use cage or buried batching machines; the larger the mixing plant is, the greater the requirements for the foundation, and for different sites, the depth of the foundation will also vary.


  As the foundation from excavation to the foundation solidification dry need more than a dozen of the process, so the manufacturer of instructional staff generally in the foundation after excavation, it has been evacuated, so the project must look good, ask clear, especially in the case of bad gas, pay attention to the ground mark good, otherwise the technician evacuated before excavation to a heavy rain to the line to wash away the trouble. In addition, there is the line dug up and then find the location of the situation occurred, so do not start to get all the lines off, especially the key places such as the host, batching machine, belt conveyor, batching machine and other key places. Once a place has a problem, you can repeat the proofreading according to the drawings to find out the location.


  After the foundation is done, the equipment on the ground should not make big changes, and wait for the equipment to be installed in the field before Certificate of good ground leveling, electricity, traffic, water and other matters.