What are the benefits of setting standby bin in concrete mixing plant production line?

2022/05/07 09:16

What are the benefits of setting standby bin in concrete mixing plant production line?

  Nowadays, most of the concrete mixing plant production lines are set up with waiting bins, so what are the benefits of setting up waiting bins in concrete mixing plant production lines? Let's take a look.

Protect the mixing machine

  In order to protect the mixing shaft, our mixing plant usually adopts the secondary mixing technology, so that the aggregate can wait in the bin and then put in the aggregate after the powder is mixed with water. Because the concrete mixer's internal two mixing shaft, the mixing shaft is mixing side arm and mixing blade, if the aggregate directly into the mixer, the mixer blade, mixing side arm impact is very large, will accelerate the mixing blade non-working wear, reducing the service life of concrete mixer.

Improve production efficiency

  Concrete mixing plant production line with intermediate bin is mainly due to the aggregate batching efficiency is sometimes higher than the efficiency of powder and water batching, so the use of transition bin waiting for the powder and water batching work. It is commonly used in large mixing plants. If a small mixing plant uses a hopper elevator, there is no intermediate bin and the aggregate can wait in the elevating hopper. At the same time, because the aggregate is heavy, it will sink at the bottom. At this time, if the aggregate is put in first, it is not good for the concrete to be mixed evenly. It will prolong the mixing cycle and slow down the mixing efficiency. At this time, if you put in the powder first and water, it is actually beneficial to mix and stir with the aggregate, which will eventually improve the mixing efficiency.