Concrete Batching Plant Ready Mix JS3000 Concrete Mixer

1.Multifunctional mixer.

  Double horizontal shaft mixer produces convection and extrusion effect on materials, suitable for mixing all kinds of dry and hard concrete, with strong production capacity, good quality and high utilization rate with less input.

2. Distinctive features of advantages. 

  Advanced mixing concept, can reduce the load of mixing, reduce the phenomenon of holding shaft of materials, three-dimensional operation trajectory can reduce the energy consumption of machinery, quickly complete the work.

  The materials to be mixed by the double horizontal shaft concrete mixer are concentrated in the relative concentration between the two shafts and interlocked to produce mutual friction in the barrel and increase the frequency of movement to achieve the mandatory mixing of materials. The design of the double horizontal shaft mixer meets the market demand, and the wide application in construction reduces the labor intensity of workers and improves the quality and efficiency of the mixture.



  Contact Now
Product Details

The concrete double horizontal shaft pressured mixer is specifically used for mixing diverse powder materials. that is, it is able to produce all styles of powdered blending substances. its mixture may be wet fly ash, calcium carbide mud, phosphogypsum, sand and gravel, furnace slag, and many others. it's far particularly used as the helping host of various preferred brick, grey sand brick and other manufacturing strains. it's miles one of the crucial equipments inside the manner of production technique of steam pressed fly ash brick and grey sand brick.

The concrete double horizontal shaft compelled mixer is in particular composed of housing, spiral shaft assembly, riding tool, piping, cowl plate, chain cover and different components (see the random outside deliver chart for info)

1 The shell is mainly composed of plates and sections, welded and fashioned inside the production plant and assembled with other parts, that is the support of the double-shaft mixer. the shell is sealed tightly, so there can be no fly ash out and leakage of ash.

2 The spiral shaft assembly is the primary component of the dual-shaft mixer, and its components are particularly left and right rotary spiral shaft, bearing seat, bearing sleeve, bearing cover, gear, sprocket, oil cup, blade and different components.


Model

JS500

JS750

JS1000

JS1500

JS2000

JS3000

Rated Productivity(m³/h)

25

40

60

90

120

150

Driving Power (KW)

18.5

30

2*18.5

2*30

2*37

2*55

Discharge Capacity (L)

500

750

1000

1500

2000

2000

Max Aggregate Size (MM)

60/80

60/80

60/80

60/80

60/80

60/80

Discharge Height (M)

1.6

   1.6

3.8

3.8

3.8

3.8

Total Weight(kg)

3700

5650

6200

8000

11000

13000

Hzs120 Low Cost Concrete Batching Plant


Hzs120 Low Cost Concrete Batching Plant


Hzs120 Low Cost Concrete Batching Plant

FAQ:

1. Whats the difference of the HZS and HLS Concrete Mixing Station?

HZS series means the aggregate lifting type is the skip hoist and the HLS series is the inclined belt.

2. How we choose the size of the concrete mixing station?

Usually we suggest customer choose the size and type according to the coverage area and the productivity of per hour. For example, customer has big space with 200 cubic meters concrete each day, then we can suggest the HLS240 concrete mixing station.

3. Whats the advantages of the bolted cement silo?

Bolted cement silo is not only designed for foreign customer but also for our domestic market.

For foreign customer it can save delivery space which will reduce the freight charges and for domestic market it can protect the environment because it avoid the outdoor welding.

4. What customer should provide before we design?

Commonly, we need the know how many kinds of the aggregate, the powder, additive type. This is the most important. What’s more the language and voltage is necessary.

5. The installation

About the installation we will arrange engineer to guide and train the operate workers, so no worry about this.

6. Payment terms and production cycle

30% prepayment when place the order, the balance should pay before delivery. Usually the delivery time is 20 days after the prepayment.


Send your message to us