219*9 Screw Conveyor

1. Large load-bearing capacity, safe and reliable.

2. Strong adaptability, easy installation and maintenance, long service life.

3. Small size of the machine, high speed, ensure fast and even conveying.

4. There is a cleaning device at the discharge end, low noise, strong adaptability, and flexible arrangement of inlet and outlet position.


  Contact Now
Product Details

Usually the screw conveyor can successfully delivery the cement and unique powder cloth to the weighing hopper form the silo. with the screw conveyor it may avoid the pollutants and enhance overall performance.

The screw conveyor is split regular with the diameter, much like the 168mm, 219mm. the small duration of the concrete blending station will pick the 168 and 219mm. for big plant will pick out the 323mm.

No longer only for the concrete blending station, the screw conveyor has applied in different area.


Model

The diameter of the outside pipe

Allowed working angle

Max conveying length

Transport capability

Motor reducer

Type

Power

Φ168

168 mm

0-45

12

17 t/h

219*6-8

7.5 kw

Φ219

219 mm

0-45

12

40 t/h

219*9-11

11 kw

Φ273

273 mm

0-45

12

80 t/h

LS250A-273-18.4/4

15/18.5 kw

Φ323

323 mm

0-45

12

110 t/h

323-22

22


LS type screw conveyor operation precautions

  1.LS-type screw conveyor should be carefully checked for remaining dust and debris in the machine tank before driving, if there is, it should be cleaned up in time. In addition, it should also check whether the import and export are smooth, if blockage is found, please clean it in time.

  2.Add the material evenly and keep a certain degree of filling.

  3.Screen should be added at the inlet to prevent metal debris from falling into the slot and getting stuck between the slot and the spiral shaft, thus causing the spiral shaft to twist and bend or the drive unit to be damaged.

  4,.The slot and slot cover must pay attention to tight, to prevent dust spillage, affecting the operating environment.

  5.Before stopping, unload the material in the body as much as possible to ensure that the equipment can be in no-load operation when it is started next time.

  6.When the operation is stopped in the middle, should be as far as possible to unload the body of the material can not be discharged in a timely manner, at this time, if the difficulties arise when starting again, the body of the material needs to be removed before starting operation.

  7.Regularly check the wear of the spiral blade, when the wear is found to be serious can be used to repair welding or change new parts. In addition, the wear and tear of the bearings should be checked frequently, and the problems found in time to change.

  8.The lubricating parts of the conveyor should be lubricated strictly according to the requirements, and often keep the internal bearings of the conveyor with sufficient lubricating oil and regular change.

  9.LS-type screw conveyor in the process of operation, once the ear-piercing noise, should be promptly investigated.

  10.LS-type screw conveyor bearings at both ends should be strictly sealed to prevent dust jamming shaft phenomenon.

  11.Pay close attention to monitor more than the allowable temperature, large pieces and water content of the material into the body to prevent damage to the equipment.